D07-12-19-0177

Site Plan Control: The City of Ottawa has received a Zoning By-law Amendment to permit the construction of an 8-unit low-rise apartment dwelling. The proposed building is 3-storeys with 2 tandem vehicle parking spaces under a cantilevered portion of the second and third storeys. View application on ottawa.ca

Preview on v2.ottwatch.ca

WardWard 15 - KITCHISSIPPI - Jeff Leiper
Received2019-10-24
Updated2020-11-17
Address (Zoning) 25 GRANT (R4UB[2621])
Possibly related devapp(s) D02-02-19-0129 - Zoning By-law Amendment
Documents
Title Modified
2020-09-23 - Approved Environmental Noise Control Study - 2020-11-17
2020-09-23 - Approved Geotechnical Investigation - 2020-11-17
2020-09-23 - Approved Phase 1 Environmental Site Assessment Revised - 2020-11-17
2020-09-23 - Approved Servicing and Storm Water Management Report - 2020-11-17
2020-09-23 - Approved Tree Conservation Report - 2020-11-17
2020-09-30 - Approved Elevations Final Design East - 2020-11-17
2020-09-30 - Approved Elevations Final Design Front - 2020-11-17
2020-09-30 - Approved Elevations Final Design North - 2020-11-17
2020-09-30 - Approved Elevations Final Design West - 2020-11-17
2020-09-30 - Approved Erosion and Sediment Control Plan - 2020-11-17
2020-09-30 - Approved Grading Plan - 2020-11-17
2020-09-30 - Approved Post Development Drainage Plan - 2020-11-17
2020-09-30 - Approved Pre Development Drainage Plan - 2020-11-17
2020-09-30 - Approved Site Plan - 2020-11-17
2020-09-30 - Approved Site Servicing Plan - 2020-11-17
2020-09-30 - Approved Tree Conservation Plan - 2020-11-17
2020-09-30 - Signed Delegated Authority Report - 2020-11-17
2019-11-28 - Application Summary - 2020-01-01
2019-11-28 - Erosion and Sediment Control Plan - 2019-11-29
2019-11-28 - Floor Plans & Elevation Drawings - 2019-11-29
2019-11-28 - Geotechnical Study - 2019-11-29
2019-11-28 - Grading Plan - 2019-11-29
2019-11-28 - Noise Study - 2019-11-29
2019-11-28 - Phase 1 ESA - 2019-11-29
2019-11-28 - Planning Rationale - 2019-11-29
2019-11-28 - Servicing and SWM Report - 2019-11-29
2019-11-28 - Site Plan - 2019-11-29
2019-11-28 - Site Servicing Plan - 2019-11-29
2019-11-28 - Survey Plan - 2019-11-29
2019-11-28 - Tree Conservation Report - 2019-11-29
Date Status
2020-07-16 Additional Submission Circulation Period Completed
2020-06-08 Application Reactivated
2020-02-24 Resubmission Received
2019-12-30 Initial Circulation Period Completed
2019-11-29 On Circulation; Initial Submission Review